Coordination drawings also known as a composite in some instances is crucial to the successful construction of a building be it commercial or institutional. Coordination basically entails avoidance of physical conflict in the preparation of the equipment in a building and the procedures of duct, piping and other systems in buildings. This risk is prominent in buildings projects that have many mechanical, electrical and plumbing needs. It is, therefore, important to include MEP coordination drawings in a site.

Essentially, MEP stands for Mechanical, Electrical, and Plumbing. Hence, these designs are utilized in order to decrease problems among different trades. For instance, in the case where there are subcontractors negotiating with one another. The competent drawings operate as a major planning instrument that will allow for smooth installation of each material.

These drawings are often made after every routine and elevation has been established. For example, an HVAC system, electrical, plumbing, as well as fire protection, piping together with other systems, and are laid out all as one. After completion and meeting approval, subcontractors can then design their detailed drawings based on the specific area they deal with.

If one recruits an effective firm that is efficient in this process, they are able to save a lot of time spent in the construction hence save a lot of money and make profits. This is crucial as very many construction sites tend to make more loss than profits. However, the quality of the drawings are different and varying from one coordination firm to another. Hiring non-professionals to save money tends to be costly as more problems emerge as the process progresses. This tends to delay the project and create more confusion.

To ensure the firm is efficient, it is important to have the knowledge involving MEP coordination tool since there is design knowledge. When applied, this tool ensures the project is in line with the set codes, as well as standards. The design detailers and engineers are often consulted on this, and involves routing property, location, configuration, and function.

Additionally, there is the construction knowledge. This assists in guaranteeing the practicability of the building as well as efficient field activities. It involves information on access requirements, configuration, construction method and safety. In this field, engineers and foremen are in charge of providing this information.

The major areas involved in the MEP process are the most important structures in building. For example, the HVAC system consists of air handling, automatic monitory systems and cooling systems. It assists in making sure that air is conditioned throughout. The fire protection yet another system that helps make buildings quick in warning people of fire as well as fire resistant.

The other areas are such as the electrical systems that involve supplying, distribution, and lighting. Plumbing system is another area that focuses on the pressure driven systems and pumped waste among many other. Finally, there is the piping system and the telephone or datacom. Therefore, there is the need for the MEP coordination in the buildings to ensure there are no damages or extra costs.